RESIDENTIAL

FOUR DESIGNS, YOU HOLD THE PERMIT.

We’re bringing the same engineering, precision and speed we deliver for industrial, resources and accommodation clients into individual homes. We build the dwelling in the factory and put it on your slab in a day. You keep the client, the contract and the certifier relationship — and you get the paperwork to sign it off.

We don’t sell direct to homeowners. If you’ve been sent here by a client, they’ll need a registered builder.

CONTACT US

THE R SERIES

RANGE

01 - ANCILLARY DWELLING

I2R R67

The granny flat your client asked for, quotable off a fixed spec in ten minutes.

AREA / BEDS / BATHS

67m² · 2 · 2

MODULES

2 — 2.4m + 3.1m wide

TRANSPORT

No oversize permit

APPROVAL

Under 70m² — building permit only

DAYS ON SITE

1

02 - ACCESSIBLE DWELLING

I2R R63A

Universal design built in, not retrofitted. For SDA, community housing and ageing in place. The granny flat your client asked for, quotable off a fixed spec in ten minutes.

AREA / BEDS / BATHS

63m² · 2 · 1

MODULES

1 — 4.6m wide

TRANSPORT

Oversize permit required

APPROVAL

Under 70m² — building permit only

DAYS ON SITE

1

03 - DETACHED HOME

I2R R105

A full family home for a lot build, regional work or government housing.

AREA / BEDS / BATHS

105m² · 4 · 2

MODULES

4 — all 2.4m wide

TRANSPORT

No oversize permit

APPROVAL

Standard building permit

DAYS ON SITE

1-2

04 - TOWNHOUSE, TWO LEVEL

I2R R109

Density on tight infill lots, with a factory-built intertenancy wall between dwellings.

AREA / BEDS / BATHS

109m² · 3 · 2

MODULES

2 — 4.6m wide, stacked

TRANSPORT

Oversize permit required

APPROVAL

Subject to site and R-code

DAYS ON SITE

2

DOUBLE GLAZED STANDARD

BAL-RATED AVAILABLE

Every dwelling is delivered double glazed. For bushfire-prone sites, the BALtech system is available as an upgrade — independently tested and BAL rated. It is a line item on the quote rather than a problem to solve, and no other supplier can offer it at all.

SEE BALTECH

WHAT YOU GET, AND WHAT IT'S WORTH TO YOU

TRADE

Every module ships with the evidence your certifier needs. If a document isn’t in the folder when the truck arrives, don’t accept the delivery.

01
NatHERS certificate
02
Structural documentation, PE stamped
03
WaterMark schedule
04
AS 2047 window test evidence
05
BAL report
06
Electrical compliance and as-installed
07
ITP records and factory sign-offs
08
Setout and connection-point drawings
TRADE PRICING
On application
TERRITORY
Non-exclusive
VOLUME
Tiered pricing
REQUEST THE TRADE PACK

STACKED ACCOMMODATION

MULTI STOREY

Where the site is tight or the headcount is high, the same room modules stack. Services run vertically through the shaft behind the bathrooms, so the building goes up without the plumbing going on the critical path.

Stairs, landings and walkways are supplied from the factory with the modules.

TALK TO US ABOUT MULTI STOREY CAMPS

STARTING A PROJECT?

TALK TO US TODAY.